I think it's easy but I search already a long time for the solution and can't find it...
I created a cuelist. When I open the handle the cue list is loaded and with the GO button each time the next cue runs.
What I want to achieve is that each cue runs automatically after the other.
Had a look in the manual but only find things to start a cuelist on a specific time.
Run cuelist automatically
Moderator: Moderators
Re: Run cuelist automatically
Culelist "Link" option : "Link Wait For Go" => "Link After Previous Cue"
Re: Run cuelist automatically
Thanks kimwida! Easy if you know, isn't it?
I found out that the 'delay in' controls how slow/fast the cuelist is played. (I have 15 cues and change all 'delay in' times at once)
Is it possible to link this 'delay time' to a wheel while the cuelist is playing?
It's a bit difficult when I want to change the speed to open the playback panel each time and enter another value
I found out that the 'delay in' controls how slow/fast the cuelist is played. (I have 15 cues and change all 'delay in' times at once)
Is it possible to link this 'delay time' to a wheel while the cuelist is playing?
It's a bit difficult when I want to change the speed to open the playback panel each time and enter another value
Re: Run cuelist automatically
There is currently no way to control the speed of a cue list. I think you might be better using a chase for this.
Re: Run cuelist automatically
Hi niclights, you are right. Chases are exactly what I need instead of a cue list. Now I can except the speed also change the cross fade.
I have 'programmed' all functions under seperate handles (color, gobo, intensity, and so on) and it works great.
Thanks to chase me everytime in the good direction!
I have 'programmed' all functions under seperate handles (color, gobo, intensity, and so on) and it works great.
Thanks to chase me everytime in the good direction!
Who is online
Users browsing this forum: No registered users and 61 guests