Hi.
I program a song to a cuelist.
Sometimes my clients play two songs without break.
Is there a way to move A cuelist to B cuelist by "Go" button??
I just want to move first step of B cuelist after last step of A cuelist.
Move from A cuelist to B cuelist
Moderator: Moderators
Re: Move from A cuelist to B cuelist
One option is to move or copy the cues from the second cue list to the first or copy the cues from both lists into a third cue list and run that. If you do want to make it work with two list you can do this by recording a macro to connect to the second list Connect, playback swop and then Go and then assigning this to a blank cue at the end of the first list. In addition add an autoload to the same cue to Load the second list which will ensure that it fires at the correct level (it will follow the level of the first list).
Re: Move from A cuelist to B cuelist
Thank you.
I think using a macro is looking good to me.
I think using a macro is looking good to me.
Re: Move from A cuelist to B cuelist
Note that for my suggestion to work you need to have both an autoload to set the level and a macro to connect it to the wheels.
Who is online
Users browsing this forum: No registered users and 29 guests